parcels
EACH PARCEL PROVIDES SPACE AND PRIVACY WITH NO VISiBLE STRUCTURES FROM NEIGHBORING PROPERTIES. WHILE AT THE SAME TIME ; ENSURING YOU ARE A PART OF A CLOSE KNIT COMMUNITY OF LIKE MINDED PEOPLE WITH UNIQUE TALENTS, SKILLS AND LIFE EXPERIENCES TO CREATE A MICRO COMMUNITY WITHIN THE FINCA.
PARCEL DESCRIPTION
- 12650m2 water no electric. Internal entrance with building platform. Only parcel with 360 views
- 10318m2 SOLD
- 21674m2 water & electric. Internal entrance with building platform. Views of Arenal volcano and countryside
- 12506m2 water & electic. Internal entrance with building platform. Views of Arenal volcano and countryside
- 16655m2 SOLD
- 20276m2 water & electric. Internal entrance with building platform. Views of Arenal volcano and countryside
- 16547m2 water & electric. Internal entrance. 2 building platforms. Views of Arenal volcano and countryside.
- 8436m2 SOLD
- 9506m2 water & electric. Internal road with building platform, Views of countryside. IN CONTRACT
- 33643m2 water & electric. Internal roads 2 building platforms. View of countryside. river and primary forest and volcano. PRICES RANGE FROM $12m2 T0 $18m2
Video can’t be displayed
This video is not available.
Video can’t be displayed
This video is not available.
Video can’t be displayed
This video is not available.
Video can’t be displayed
This video is not available.
Video can’t be displayed
This video is not available.
Video can’t be displayed
This video is not available.
Video can’t be displayed
This video is not available.
Property Closing Cost
1. Buyer will pay for closing cost. On average this is 4% of the purchase price.
2,, Transfer, taxes. stamps and legal fees for notarization ot title deed is set by law.
* transfer tax 1.5%
* legal fee for notarization of transfer deed 1% - 1.5%
3. Survey of land appoximently $500
4. Escrow fees approximently $400+ depending on purchase price.
5. If you decide to set up a corporatioan lawyer will charge $750+
https://www.costaricalaw.com/calculators/closingcosts.htm
Average Building Cost
TO OBTAIN A BUILDING PERMIT YOU WILL NEED....for construction exceeding 70m2
1. Four copies of the construction plans.2. Four copies of the property cadastre plan (plano catastrado).3. Two copies of the property deeds (escritura).4 One copy of the consulting contract created with your architect or engineer (contrato de consultoria).5. Approval from the water department (AyA) Showing availability of water.6. One copy of your electrical design plan approved by SNE.7. Proof taxes are up to date 8. One copy of consulting contract with licensed engineer or architect. WE PROVIDE YOU WITH THE LAND USE PERMIT WE PROVIDE THE WATER CERTIFICATION LETTER WE PROVIDE THE ELECTRIC AVAILABILITY LETTER Average building cost per square meter $300 - $1000 square foot $30 - $400
1. Four copies of the construction plans.2. Four copies of the property cadastre plan (plano catastrado).3. Two copies of the property deeds (escritura).4 One copy of the consulting contract created with your architect or engineer (contrato de consultoria).5. Approval from the water department (AyA) Showing availability of water.6. One copy of your electrical design plan approved by SNE.7. Proof taxes are up to date 8. One copy of consulting contract with licensed engineer or architect. WE PROVIDE YOU WITH THE LAND USE PERMIT WE PROVIDE THE WATER CERTIFICATION LETTER WE PROVIDE THE ELECTRIC AVAILABILITY LETTER Average building cost per square meter $300 - $1000 square foot $30 - $400